Fadhili CHP Plant (FCHPP). 2020-07-08T11:37:02+03:00

Project Description

Fadhili CHP Plant (FCHPP)

Start Date: Mar. 16, 2017

End Date: On-going

Client:

DOOSAN Heavy Industries and Construction

Fadhili CHP Plant (FCHPP).

Fadhili Combined Heat and Power Plant (FCHPP) is a co-generation power plant to be constructed in the Eastern Providence of the Kingdom Located adjacent to the Fadhili gas processing plant (FGP), 50km away from Jubail Industrial City in Saudi Arabia

FCHPP co-generation power plant will have an installed capacity of 1,507MW.

Project Goal and Scope:

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).
  • Review & Evaluate the installation package documents produced by fire protection contractor. Identify the format and contents of Safety and Fire Protection Packages which are to be submitted to the High Commission for Industrial Security (HCIS) as required in SAF-01.
  • Obtaining HCIS approval.