SABTANK Solid Area (Section A & C) Project

Start Date:
Jul. 01, 2015

End Date:
May. 31, 2016

Location:
Jubail, Kingdom of Saudi Arabia

Your Content Goes Here

Client:

Saudi Basic Industries (SABIC) Sabtank Affiliate

SABTANK Solid Area (Section A & C) Project

SABTANK Solid Area Section ‘A & ‘C’ has conventional Fire detection and alarm system. To meet SABIC Engineering Standard and HCIS directives 2010 existing conventional Fire detection and alarm system has to converted addressable Fire detection and alarm system.

 Project Goal and Scope:

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).

Obtaining HCIS approval.