Yanbu 2 SWRO Desalination Plant 2020-08-08T12:55:20+03:00

Project Description

Yanbu 2 SWRO Desalination Plant

Start Date:
March 2019

End Date:
May 2019 (FEED)

Location:
Yanbu, Kingdom of Saudi Arabia

Your Content Goes Here

Client:

Fichtner

Yanbu 2 SWRO Desalination Plant

SWCC has a desalination plant in Yanbu industrial city consists of three existing plants. Phase # 01 (Yanbua1 plant) designed to produce a 94,625 m3/day., phase # 02 (Yanbu 2 plant) designed to produce 94,625 m3/day, and phase # 03 (RO phase) designed to produce 106,904 m3/day. SWCC is planning to install a new Yanbu 2 SWRO Desalination plant project. The new desalination Plant designed to produce a 250,000 m3/day.

 

Project Goal and Scope:

 

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).

 

Obtaining HCIS approval